Back to overview
Maintenance

Etherlink Sequencer Infrastructure Maintenance

Jul 29 at 09:00am BST  –  Jul 29 at 09:15am BST
Affected services
Etherlink Mainnet Relay RPC

Resolved
Jul 29 at 09:00am BST

We are going to make adjustments on the infrastructure of the sequencer, ahead of the change of operator. The downtime should be minimal, and the block production should not be affected. But it is possible that some RPC requests fail during the maintenance window.