Back to overview
Maintenance

Etherlink testnet: stresstest

Apr 16 at 01:00pm BST  –  Apr 16 at 02:00pm BST
Affected services
Etherlink Ghostnet [Block Production]
Etherlink Ghostnet [Read Transactions - eth_call]
Etherlink Ghostnet [Relay - Block Production]

Resolved
Apr 16 at 01:00pm BST

During this window core Etherlink engineering team will perform a stresstest of the network.

Users can expect higher latency for transaction inclusion. The team will try to reduce the time window for minimal impact on the network.