Back to overview
Maintenance

Etherlink Sequencer Operator Migration

Aug 01 at 07:50am BST  –  Aug 01 at 08:30am BST
Affected services
Etherlink Mainnet RPC [Block Production]
Etherlink Mainnet RPC [Smart Contract Read Operations]
Etherlink Mainnet Relay RPC
Etherlink FA Token Bridge (Watch Tower)
Etherlink FA Token Bridge (Watch Tower 2)

Resolved
Aug 01 at 07:50am BST

The migration from MIDL.dev to the new sequencer operator is expected to take place around 8AM BST (following a successful vote by Tezos bakers). MIDL.dev will halt block production 5 minutes ahead of the migration, and the new operator will resume it a few minutes after the migration. The migration will be transparent for the node providers (no manual intervention is needed except for upgrading their nodes to v0.35 or higher)