Back to overview
Maintenance
Mainnet Infrastructure Upgrade
Aug 5, 2025 at 8:45am UTC
–
Aug 5, 2025 at 9:00am UTC
Affected services
Etherlink Mainnet RPC [Block Production]
Etherlink Mainnet Relay RPC
Etherlink FA Token Bridge (Watch Tower)
Etherlink FA Token Bridge (Watch Tower 2)
Resolved
Aug 5, 2025 at 8:45am UTC
We will perform a software upgrade on the Etherlink Mainnet sequencer. Temporary disruption in transaction sequencing may occur during this window.
Affected services